Monthly Archives: October 2013

Horizontal Dewatering Oct 2013 APLNG Gas Pipe Line

Post Image

Aussie Drain is currenly installing Horizontal Dewatering on the 360 km long APLNG gas pipe line from the Bowen Ranges to Curtis Island near Gladstone . With water tables sometimes up to the surface, pipeline contractors McConnel Dowell chose Aussie Drain and Coates to make sure the 42″ pipe line successfully can be installed at […]

Read More